Production Improvement in Din-Kor Tiles Process: A Case study of World
Heritage Town Luang Prabang
ประเภทบทความ :
บทความวิชาการ
หมวดหมู่ :
วิศวกรรมอุตสาหการ
This research improves the Din-kor tiles handling problem for increase the Din-kor tiles quantity which
2 methods to the problems solution are 1. The distance of handling decrease by improving the plant layout. As a
result, the improvement of plant layout is produced by Computerized Relationship Layout Planning (CORELAP)
method, which can reduce the distance of handling by 60 meters per day or 12% of the distance before improvement
2. The new equipment design is a basket for containing tiles, which can reduce the distance of handling by 480
meters per day or 50% of the distance before improvement. Moreover, the wasting time from airing tiles process
can be reduced by 40 minutes or 22%. Therefore, this improvement can reduce the overall distance 540 meters per
day and the wasting time from airing tiles process decreases 40 minutes.
วันที่ลง01/07/2019
321
